MSC JUANITA F
AFT Port Mooring Winch Leaking Hydraulic Tray Repair
Date: May 2024 | Duration: 12 hrs | Port: Colombo
- Addressed an urgent hydraulic tray oil leak from the AFT Port side mooring winch, which was spilling onto the deck.
- Proposed a swift repair solution involving opening the gearbox side cover and replacing the hydraulic tray’s steel plates.
- Completed the repair within 12 hours to prevent any delays in the vessel’s trading schedule.
- Repair was performed by class-approved, professional 6G welders, ensuring high-quality and durable results for uninterrupted operation.